<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2068773736745421&amp;ev=PageView&amp;noscript=1">

Ian Radcliffe

Recent Posts

How We Installed a New Spillway Wall at a Private Hydropower Dam

Posted by Ian Radcliffe on November 16, 2020

102 years of lateral earth pressure and deterioration at Pisgah Dam caused its existing spillway wall to lean. Partnering with private dam owner Otter Tail Power Company, Nelosca ensured their hydropower dam received necessary repairs. The project included concrete demolition and the replacement of the dam's north spillway wall over two years.

Read More