Our ability to provide turnkey, time critical infrastructure projects will ensure that your projects stays on schedule with minimal interruptions to the right of way. Nelosca personnel are knowledgeable in all sizes of bridge replacements, whether they are steel, concrete or wooden. Throughout the project we create a collaborative environment with the owner and its representative engineer to ensure that work is carried out in the most efficient way.
A key component to bridge span replacement projects is the ability to minimize track downtime. Nelosca's team of railroad professionals will safely and efficiently replace spans with little interference to the right of way. We have the experience necessary to replace spans and install new piers and abutments while beholden to critical deadlines and truncated windows of operations.
Nelosca’s fleet of equipment includes hi-rail boom trucks, rotary dumps, and concrete mixers, as well as several sizes of cranes and excavators. Whether the replacement is on land, over the water, or even in a marshland, we can access the site safely in a variety of environments.
57 West 57th Street
New York, NY, 10019
Phone: 516-494-0803
24/7 Service
Call 662-405-0243
Copyright © 2015 Nelosca Technologies Inc.