What Is Treatability: An Important Asset in Environmental Dredging

Posted by Amber Wilson on February 29, 2024

Treatability testing uses bench-scale demonstrations and analysis to determine if a material can be effectively treated with a specific chemical or process. At Nelosca, we use treatability testing to develop sound technical approaches for dredged material dewatering, in situ or dewatered dredged material stabilization, and water treatment. 

Treatability data can be used to price a job more accurately and find cost savings for our clients. Treatability testing allows us to select chemical and mechanical processes for treatment and evaluate less costly alternatives. Here's how we do it.

Read More

Diver-Assisted Dredging and Capping Used in the Cuyahoga River Improvement Project

Posted by Kimberly Walters on June 15, 2023

The Cuyahoga Improvement Project in Kent, OH, aims to improve future recreation experiences while protecting existing natural resources. The purpose of our work is to remove areas of petroleum-impacted soft sediments that were deposited decades ago from discontinued industrial practices upstream. 

Background on a Burning River

The Cuyahoga River has quite a history: a transportation route; a boundary; an origin for oil, rubber, and steel industries; a power source; and a dumping ground. The river was once 1 of the most polluted in the country. The Cuyahoga has caught fire at least 13 times since the 1860s.

Read More

Nelosca Acquires Dredging & Dewatering Division

Posted by Kimberly Walters on February 07, 2023

February 6, 2023 — Specialty marine contractor Nelosca Technologies, Inc. (Nelosca) recently finalized the asset acquisition of the dredging and dewatering division of Infrastructure Alternatives, Inc. (IAI). The purchase brings dewatering, water treatment, and treatability testing services into the organization for the first time.

Read More

7 Cost-Drivers of a Dredging Project

Posted by Dillon Hogan on November 13, 2018

Dredging projects are complex and involve many components and significant planning before operation. The intricacy of these projects means that pricing is often multifaceted. Here are seven common areas that drive overall costs on a dredging project.

Read More

The Basics of Using Polymers on Dredging Projects

Posted by Dillon Hogan on October 16, 2018

Why Add Polymers?

 

One of the biggest challenges on a dredging project is managing the water that is excavated and transported with the sediment. On hydraulic dredging jobs where sediment and water are pumped through a pipeline as a slurry, water can account for 90+ percent of the volumetric flow. After the slurry reaches the disposal area, the water must be separated from the sediment, collected, and often clarified or treated. This process must happen as fast as the water is being pumped, which for a 12-inch cutterhead dredge could be 5,000 gallons per minute.

Read More