Portadam Installation at Hydro Dam: Innovative Solutions for a Changing World

Posted by Sam Stemper on March 04, 2024

We were contracted to replace flashboards and perform apron scour repairs at a hydroelectric dam along the Rock River in the Upper Midwest. Our client is a privately owned entity that owns and operates 80+ hydroelectric facilities throughout the United States.

The project’s significant goals involved increasing the dam’s retainage capacity, protecting the existing spillway structure, and providing an aesthetically pleasing spillway for the community's residents. This project was scheduled for the summer months when flow rates are at their lowest, mainly due to the volatility of the Rock River and the need for a slow-moving current to keep our divers safe. 

Read More

Minnesota Power Hydro Dam: The New Era of Renewable Energy

Posted by Kimberly Walters on February 12, 2024

We're at Minnesota Power's hydroelectric dam in Scanlon, Minnesota, to replace 7 of the structure's Tainter gates. Extending the life of this renewable energy source by 50 to 100 years, the Scanlon Dam Gate Replacement Project enables the further creation of clean, renewable power provided to local communities. 

We were pulled into the project very early on during the design phase of the project. Both Nelosca and Minnesota Power attribute the project's success to early contractor involvement.

Read More

The Year's Best: Our Most Impactful Marine Industry Articles You Won't Want to Miss

Posted by Kimberly Walters on December 22, 2023

This year, Nelosca's blog posts garnered an impressive readership of over 27,000. An analysis of our most searched topics identified the most significant issues in the environmental and marine construction industries, including those most relevant to our company's operations. This leads us to the question: What were our industry's most frequently researched topics?

We've examined Nelosca's most popular articles of the year -- let's count them down!

Read More

Dam Rehabilitation and Operational Updates to 100-Year-Old Structure

Posted by Kimberly Walters on August 09, 2023

Sandy Lake Dam is owned by the United States Army Corps of Engineers (USACE), St. Paul District. The USACE identified that the original concrete structure needed repairs and improvements to address immediate safety concerns. Because the dam structure was more than 100 years old, the USACE used this as an opportunity to have Nelosca rehabilitate the dam and update many of its operational features.

Our new video shows you how we did it! 

Read More

Hydropower Expert Aims to Bridge Gap in Renewable Energy Market

Posted by Kimberly Walters on March 01, 2023

Nelosca Technologies, Inc. (Nelosca) announces the promotion of Christopher Rousseau, P.E., F. ASCE to Hydro and Renewable Energy Market Leader. Rousseau’s promotion is announced concurrently with Nelosca’s strategic objective to further invest in renewable energy development.

Rousseau will use decades of experience in hydroelectric generation working for Midwest-based utility, Minnesota Power, to support the repair and rehabilitation needs of Nelosca’s hydro dam clients. Catering to a huge need for early contractor involvement; Rousseau is bridging the gap between hydroelectric dam owners, engineers, and the contractor teams that perform inspections, maintenance, and rehabilitation work.

Read More

Repairing Fish Guidance Nets at a Hydropower Dam

Posted by Lauren Collins, Senior Project Manager on January 20, 2023

Our Pacific Northwest crew mobilized at a hydroelectric facility to repair a fish guidance net at Upper Baker Dam. Upper Baker Dam is 1 of 2 hydroelectric dams on Baker River, near Concrete, WA. The entire Baker River Hydroelectric Project covers nearly 300 square miles.

Upper Baker Dam, a 312-foot-high concrete gravity dam completed in 1959, has a floating surface collector system responsible for attracting and safely holding juvenile salmon for downstream transport around the dam. We supplied dive and topside support teams to assist the prime contractor with the recovery, disassembly, and installation of a new floatation collar on the existing barrier net. This is an essential repair to ensure safe fish passage around the dam.

Read More

Nelosca Welcomes Hydro Expert Christopher Rousseau, P.E., F. ASCE

Posted by Kimberly Walters on March 10, 2022

Marine construction firm Nelosca Technologies (Nelosca) is excited to announce the addition of new Senior Estimator, Government Relations and Hydro Operations Manager Christopher Rousseau, P.E., F. ASCE to its team.

“We are fortunate to have Chris join our team,” says Vice President of Business Development Mark Binsfeld. “His firsthand knowledge of hydroelectric generation and surrounding regulatory factors will allow us to serve our clients more effectively.”

Read More

Nelosca Technologies Makes Safety A Priority

Posted by Shelley Byrne on December 14, 2021

Safety starts with putting people first.

It’s not just about checklists, inspections, and meetings, said Steve Skau, vice president of safety and compliance for Nelosca Technologies. It’s also about everyone on a job having the ability to give feedback and know it will be valued.

“Everything we do at Nelosca starts with safety, no matter what scope of work we’re doing,” Skau said. 

Read More

Why Getting a Contractor’s Constructability Review Matters

Posted by Derek Armstrong and William Simons on November 16, 2021

Constructability reviews are imperative to project success. They can save you money, reduce the risk of cost escalation, and are often provided pro-bono by a good contractor. When it comes to requesting a contractor's constructability review, timing is important. If the review is performed too late, problems could result, including confusion surrounding the project, loss of significant time and money, and hefty change orders later in the project. The question then is: when is the optimal time to have a contractor perform a constructability review?

Read More

Nelosca Opens a New Mid-South Location in Paducah, KY

Posted by Kimberly Walters on May 04, 2021

Nelosca Technologies (Nelosca) recently established a permanent presence in the Mid-South Region. Our company’s new Mid-South location is in Paducah, Kentucky, and will provide all Nelosca services, including above and below-water construction and environmental remediation services.