7 Cost-Drivers of a Dredging Project

Posted by Dillon Hogan on November 13, 2018

Dredging projects are complex and involve many components and significant planning before operation. The intricacy of these projects means that pricing is often multifaceted. Here are seven common areas that drive overall costs on a dredging project.

Read More

The Basics of Using Polymers on Dredging Projects

Posted by Dillon Hogan on October 16, 2018

Why Add Polymers?

 

One of the biggest challenges on a dredging project is managing the water that is excavated and transported with the sediment. On hydraulic dredging jobs where sediment and water are pumped through a pipeline as a slurry, water can account for 90+ percent of the volumetric flow. After the slurry reaches the disposal area, the water must be separated from the sediment, collected, and often clarified or treated. This process must happen as fast as the water is being pumped, which for a 12-inch cutterhead dredge could be 5,000 gallons per minute.

Read More