Why Getting a Contractor’s Constructability Review Matters

Posted by Derek Armstrong and William Simons on November 16, 2021

Constructability reviews are imperative to project success. They can save you money, reduce the risk of cost escalation, and are often provided pro-bono by a good contractor. When it comes to requesting a contractor's constructability review, timing is important. If the review is performed too late, problems could result, including confusion surrounding the project, loss of significant time and money, and hefty change orders later in the project. The question then is: when is the optimal time to have a contractor perform a constructability review?

Read More

Nelosca Proudly Establishes Joint Venture with Ahtna

Posted by Kimberly Walters on February 15, 2021

Nelosca Technologies (Nelosca) formally announces their Small Business Administration (SBA) 8(a) certified joint venture with Ahtna Marine & Construction Company, LLC (AMCC). Publicly titled the Ahtna – J.F. Nelosca JV, the partnership establishes a mentor protégé relationship between Nelosca and Alaska Native Corporation subsidiary AMCC.

Read More

River Restoration: Small Dredges Prove Useful in Waterways

Posted by Paul Olander, Senior Project Manager on March 25, 2020

As the sun on the dredging season in the Midwest inland areas began to set, operations were starting to heat up on the east coast for Nelosca Technologies (Nelosca). For a third straight year, Nelosca has had the opportunity to procure work in the milder maritime climate throughout New England during the winter months. These months are key for in-water work on the east coast as they provide opportunities to revitalize salt marshes, re-nourish beaches and restore navigation outside of the fish migration and spawning windows. Generally, this work has been undertaken in and near the coastal salt marshes adjacent to the smaller resort communities.

Read More

The Basics of Using Polymers on Dredging Projects

Posted by Dillon Hogan on October 16, 2018

Why Add Polymers?

 

One of the biggest challenges on a dredging project is managing the water that is excavated and transported with the sediment. On hydraulic dredging jobs where sediment and water are pumped through a pipeline as a slurry, water can account for 90+ percent of the volumetric flow. After the slurry reaches the disposal area, the water must be separated from the sediment, collected, and often clarified or treated. This process must happen as fast as the water is being pumped, which for a 12-inch cutterhead dredge could be 5,000 gallons per minute.

Read More